S&Z razed and abated the existing building before constructing the new 16,500 sq. ft. building. The project included all required utilities, infrastructure, interior and exterior finishes, landscaping, hardscaping and parking and pedestrian areas.
Umass Morrill IV
University of Massachusetts Amherst. Interior renovation of Morrill IV included new labs, offices, fume hood rooms, freezers, casework, fire protection, plumbing, HVAC and electrical.
Levy Heywood Library
Ground-up construction of a new steel library in Gardner, MA. The most unique feature was the 270° radius architectural construction for the front of the building.
Richmond Consolidated School
A new addition to the existing school is two stories and includes a new gymnasium, administrative offices, and classrooms.
Pelham Community Center
Ground-up construction of a new town building to house both a library and police station.
Leverett Elementary
This sizeable addition to the existing school included a new library, handicap access, and a renovation to the existing kitchen.